Tennessee Hollow: Difference between revisions

(New page: Image:Tennessee-hollow-Oct-2005 1467.jpg '''Tennessee Hollow, a creek running from El Polin Spring to the Bay at Crissy Field, was submerged by military debris for over 100 years. In ...)
 
No edit summary
Line 13: Line 13:
The most dramatic restoration has taken place at a former landfill site, located off Lincoln Boulevard near Halleck Street on the Main Post. In 2005 as part of the Presidio Trust’s environmental remediation program, 77,000 tons of debris were removed, and a portion of the creek was “daylighted” through the restored valley. More than 35,000 seedlings from the Presidio Nursery were planted to create wildlife habitat.
The most dramatic restoration has taken place at a former landfill site, located off Lincoln Boulevard near Halleck Street on the Main Post. In 2005 as part of the Presidio Trust’s environmental remediation program, 77,000 tons of debris were removed, and a portion of the creek was “daylighted” through the restored valley. More than 35,000 seedlings from the Presidio Nursery were planted to create wildlife habitat.


''from Presidio Trust [http://www.presidio.gov/trust/projects/tenn/ website]''
''--from Presidio Trust [http://www.presidio.gov/trust/projects/tenn/ website]''


[[Lovers Lane |Prev. Document]] [[From Post to Park|Next Document]]
[[Lovers Lane |Prev. Document]] [[From Post to Park|Next Document]]


[[category:Presidio]] [[category:Ecology]] [[category:2000s]]
[[category:Presidio]] [[category:Ecology]] [[category:2000s]]

Revision as of 18:26, 25 September 2008

Tennessee-hollow-Oct-2005 1467.jpg

Tennessee Hollow, a creek running from El Polin Spring to the Bay at Crissy Field, was submerged by military debris for over 100 years. In October 2005, it had been cleared and readied for native plant restoration.

Photo: Chris Carlsson

Tennessee-Hollow-Sept-2008 4083.jpg

After three years, the willows along the creek are flourishing, as are many other plant and animals species along the restored riparian corridor. This photo taken in September 2008.

Photo: Chris Carlsson

The most dramatic restoration has taken place at a former landfill site, located off Lincoln Boulevard near Halleck Street on the Main Post. In 2005 as part of the Presidio Trust’s environmental remediation program, 77,000 tons of debris were removed, and a portion of the creek was “daylighted” through the restored valley. More than 35,000 seedlings from the Presidio Nursery were planted to create wildlife habitat.

--from Presidio Trust website

Prev. Document Next Document